The graph below shows the price charged by a plumber for the time spent on a particular job. The y-axis shows the price in dollars, and the x-axis shows the number of hours spent working on the job.
Draw a vertical line from the x-axis at 3 hours, and read off the graph on the y-axis.
Approximately $225
A particular job cost $320. Find the length of time the job took.
Draw a horizontal line from the y-axis at $320, and read off the graph on the x-axis
Approximately 4.5 hours
This would be the price charged for 0 hours; the y-intercept of the graph.
Read this value off the graph at the point where the line graph meets the y axis.
Approximately $45.